Timloc

Timloc Rafter Roll 6m

£8.87 INC. VAT
£7.39 EX. VAT
Size:
Quantity:

Rafter Roll

Designed to maintain ventilation between insulation and roofing felt to prevent the build-up of condensation. Suitable for new build and refurbishment work.

Use:

  • For pitched roof eaves ventilation

  • On standard pitched roofs where the pitch is 15 degrees or more and the roof void is an attic or loft space

  • On roofs with rafter spacings of between 400mm and 600mm centres

Features and Benefits

  • Durable, totally resistant to decay, easy to fit 

  • Supplied in convenient 6m rolls 

  • Suitable for new build and refurbishment project

Quality

  • Satisfies all NHBC requirements 

  • Manufactured to BS EN ISO 9001 and BS IN ISO 14001

  • Complies with all relevant Building Regulations 

  • Meets all relevant British Standards

Material and Colour

  • Manufactured by vacuum forming in UPVC.

  • Available in black only.

Products in the System

300mm rafter roll - Product 1121 Single row of 300mm roll panel coverage suitable for:

Insulation depth

Min roof pitch (deg.)

225mm

40°

250mm

45°

 

400mm rafter roll - Product 1171 Single row of 400mm roll panel coverage suitable for:

Insulation depth

Min. roof pitch (deg.)

225mm

32.5°

250mm

37.5°

300mm

48.5°

 

600mm rafter roll - Product 1131 Single row of 600mm roll panel coverage suitable for:

Insulation depth

Min roof pitch (deg.)

225mm

20°

250mm

22.5°

300mm

27.5°

400mm

37.5°

 

800mm rafter roll - Product 1151 Single row of 800mm roll panel coverage suitable for:

Insulation depth

Min roof pitch (deg.)

225mm

17.5°

250mm

20°

300mm

22.5°

400mm

30°

 

Installation Advice

  • Unroll the ventilator along the rafters along the full length of the eaves and along both sides of the building to create a cross flow ventilation action.
  • Position centrally above the wall plate. This is the narrowest part of the roof where the roof insulation is most likely to constrict the airflow.
  • Push the corrugations down over the top of the rafters and secure using clout nails or staples.

Ordering Information

  • Measure the overall length of the eaves to be ventilated and divide by 6m to determine the number of rolls of ventilator required.

Data Sheet

Click here for data sheet

You may also like

Recently viewed